SectorsSpare parts and MRO

Planning spare parts and MRO: rare use, vital parts, depots in the field.

Spare parts that are used rarely and in lumps, many of them vital, planned maintenance that claims parts ahead, and depots that supply the field crews. See how plnnd plans it on Holmvaart Water Services, a fictional regional water utility.

What makes it hard

The planner’s week in this sector.

Rare and lumpy use

Most parts sit on the shelf for weeks and then go in a lump. An ordinary average is too high most of the time and too low when it counts.

Vital parts

A missing vital part can stop a pumping station; a shelf full of slow parts ties up cash. Both are real costs.

Maintenance claims parts ahead

Planned maintenance reserves parts weeks in advance, next to the breakdowns nobody planned.

Depots in the field

Field crews use consumables every day from local depots, which are refilled from a central warehouse.

What plnnd does about it

Shown on the Holmvaart Water Services sample.

Forecasts made for rare use

plnnd only offers forecast methods that fit an item’s demand pattern; for rare, lumpy use those are methods made for occasional demand. For the Sludge Pump Rotor, a vital part, one is recommended, with the reason in plain words.

Forecast simulation for the Sludge Pump Rotor of Holmvaart Water Services: Croston SBA recommended and active, Moving average (13 weeks) passed over for its bias, and per method the forecast, safety stock, reorder point, stockout and order-by date, fill rate and state.Forecast simulation for the Sludge Pump Rotor of Holmvaart Water Services: Croston SBA recommended and active, Moving average (13 weeks) passed over for its bias, and per method the forecast, safety stock, reorder point, stockout and order-by date, fill rate and state.

Maintenance work orders in the plan

Planned maintenance reserves parts ahead, next to the forecast. The Pressure Transmitter 0-10bar has a maintenance work order for 1 on 3 October; the monthly chart shows a year of its lumpy use.

Monthly chart for the Pressure Transmitter 0-10bar at Central Warehouse Zwolle: occasional large demand in the past months, receipts, then a steady forecast with its likely range and the safety stock line at 35.Monthly chart for the Pressure Transmitter 0-10bar at Central Warehouse Zwolle: occasional large demand in the past months, receipts, then a steady forecast with its likely range and the safety stock line at 35.

Vital parts first

Value class and criticality (Vital, Essential, Desirable) are two separate labels, and each item has its own target service level, so a cheap Vital part can be protected well. 36% of Holmvaart’s material-locations are Vital; filter on them in one click.

The Materials list for Holmvaart Water Services: spare parts at the central warehouse and depots, with value class, demand pattern, state and how long it has lasted, stock, safety stock and reorder point.The Materials list for Holmvaart Water Services: spare parts at the central warehouse and depots, with value class, demand pattern, state and how long it has lasted, stock, safety stock and reorder point.

Depots refilled from the central warehouse

The Flange Gasket DN150 at Depot Raalte is Critical: the date to order by passed on 11 September, and stock runs out on 9 October. plnnd suggests a new order of 200 from the central warehouse.

Material Detail for the Flange Gasket DN150 at Depot Raalte: Critical, 37 units in stock against a safety stock of 68, and Why this status: the minimum order date has passed, so a new order cannot arrive before the stockout on 9 October.Material Detail for the Flange Gasket DN150 at Depot Raalte: Critical, 37 units in stock against a safety stock of 68, and Why this status: the minimum order date has passed, so a new order cannot arrive before the stockout on 9 October.
The sample company

Holmvaart Water Services at a glance.

A fictional company with realistic data: three years of daily demand, planned as of 27 September 2026. Compare it with your own business before you choose it for the free demo.

What it does
A regional water utility: a central warehouse of spare parts for its treatment plants and pumping stations, and three depots for the field crews’ consumables.
Locations
Central Warehouse Zwolle and the depots Kampen, Raalte and Hardenberg.
Items
196 material-locations: 157 parts at the central warehouse and 39 at the three depots.
Demand
Six in ten used rarely or in lumps; 36% Vital; 17 maintenance work orders; no customer orders.
Suppliers
6 suppliers (pump service, valves, instruments, automation, water treatment, industrial supply), lead times from 2 to 12 weeks; the depots are refilled from the central warehouse in 3 to 4 weeks.
Orders
41 open purchase order lines.
Stock
About €2.2 million.
Needs attention
22 of 196 material-locations, with 40 open actions.

Choose Holmvaart Water Services if your business…

  • keeps spare parts for its own plants, machines or fleet;
  • has many parts that are used rarely, some of them critical;
  • plans maintenance with work orders;
  • runs depots or vans for field crews, refilled from a central store.

Three things to try first

  1. A rarely used vital part. Open the Sludge Pump Rotor (HWS-10323) and scroll to the forecast simulation: which methods fit, and why one is recommended.
  2. A depot running out. Open the Flange Gasket DN150 at Depot Raalte: Critical, with the reason and a new order from the central warehouse.
  3. The parts that must not run out. In Materials, filter on VED class Vital.