Rare and lumpy use
Most parts sit on the shelf for weeks and then go in a lump. An ordinary average is too high most of the time and too low when it counts.
Spare parts that are used rarely and in lumps, many of them vital, planned maintenance that claims parts ahead, and depots that supply the field crews. See how plnnd plans it on Holmvaart Water Services, a fictional regional water utility.
Most parts sit on the shelf for weeks and then go in a lump. An ordinary average is too high most of the time and too low when it counts.
A missing vital part can stop a pumping station; a shelf full of slow parts ties up cash. Both are real costs.
Planned maintenance reserves parts weeks in advance, next to the breakdowns nobody planned.
Field crews use consumables every day from local depots, which are refilled from a central warehouse.
plnnd only offers forecast methods that fit an item’s demand pattern; for rare, lumpy use those are methods made for occasional demand. For the Sludge Pump Rotor, a vital part, one is recommended, with the reason in plain words.


Planned maintenance reserves parts ahead, next to the forecast. The Pressure Transmitter 0-10bar has a maintenance work order for 1 on 3 October; the monthly chart shows a year of its lumpy use.


Value class and criticality (Vital, Essential, Desirable) are two separate labels, and each item has its own target service level, so a cheap Vital part can be protected well. 36% of Holmvaart’s material-locations are Vital; filter on them in one click.


The Flange Gasket DN150 at Depot Raalte is Critical: the date to order by passed on 11 September, and stock runs out on 9 October. plnnd suggests a new order of 200 from the central warehouse.


A fictional company with realistic data: three years of daily demand, planned as of 27 September 2026. Compare it with your own business before you choose it for the free demo.
On the sign-up page, choose “Spare parts and MRO”. The choice stays for your whole demo.