One plan, built from your own numbers.

plnnd connects to your orders, stock levels, lead times and bill of materials. Everything it shows, from a forecast to a criticality score, is calculated on that data.

Forecasting

Six models. Switch until it fits.

Every material behaves differently. Pick a model per material, compare how stock and risk change, and keep the one that matches reality. Each forecast comes with a range, so you can see how sure it is.

Scenario simulation

Ask "what if" before you commit.

A supplier slips three weeks. Demand jumps 20%. A line goes down for maintenance. Run the scenario and see which orders, materials and lines it touches, and when.

ScenarioSupplier delay +3 wk
Orders at risk7
First impactW38 · Line 2
Stockouts and criticality

Know what to act on first.

plnnd flags the week each material drops below safety stock. It then ranks every material by criticality, based on lead time, stock cover and what depends on it, so the most urgent work sits at the top.

MAT-10482 · short in W41Critical
MAT-20931 · cover 3.1 wkWarning
MAT-30117 · cover 9.4 wkHealthy
AI integration

Connect your own AI model. Ask it why.

Link the model you already use with your own API key. plnnd only sends it encrypted data. In return you get plain-language answers about your plan: what drives a forecast, why a material is critical, and which forecast model suits it best.

API key ····7f3aConnectedEncrypted data only
Why is MAT-10482 critical?
Under Global LightGBM ML, stock drops below safety stock in W41. The lead time is 6 weeks, so an order placed after W35 arrives too late. Two production orders on Line 2 depend on it.
Which forecast model fits MAT-20931?
Croston TSB. Demand is intermittent: 31 of the last 52 weeks had no orders, which averages-based models handle poorly.